Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13675039

- Product Categories
- Friendly Links
- home > Supply > Xi'an demolition project, the demolition of Xi'an Rainbow (online consultation), Xi'an demolition
Information Name: | Xi'an demolition project, the demolition of Xi'an Rainbow (online consultation), Xi'an demolition |
Published: | 2015-06-29 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | 6.0.3 demolition project construction, should be dust and noise reduction measures to prevent. 6.0.4 After completion of demolition, removal of sediment should be promptly played. 6.0.5 construction site should establish a sound management system flare up. When construction work flare, flare up approval procedures must fulfill, after receiving hot work permit before the designated time and place operations. Job should be equipped with hand care, must be confirmed before leaving the job after the job site without danger after the fire source. 6.0.6 When removing the building, Xi'an demolition, when the case of flammable and combustible materials and insulation materials, non-fire operations. This specification wording of Note 1 to facilitate discrimination in the implementation of the provisions of this specification, to the extent of demanding different terms as follows: 1) a very strict so do not be a: 2, health, Xi'an demolition costs, as The project area, Xi'an demolition prices, Horticultural Expo held in April, Xi'an demolition equipment, garage until excavation, construction vehicles and from many other factors, the project developed a special anti-dust measures. From the west entrance to Xinyu services company dormitory arrange two cleaning staff is responsible for roads, toilet hygiene cleaning, watering work, labor companies Telford road from the site to the east dormitory, arrange for sanitary cleaning, watering work. Loess bare part of the site with a dense mesh cover, from time to time watering, control of dust filled the air, keeping clean and tidy inside dormitories, blankets clothes stacked neatly by cleaning staff in charge of cleaning up the dormitory and supervision. Project department of personnel from time to time to check, identify problems and implement improvement. Xi'an demolition project, the demolition of Xi'an Rainbow (online consultation), provided by the Xi'an Xi'an demolition demolition Engineering Co. Cariboo. Xi'an Rainbow demolition Engineering Co. (www.xarbcq.com) (www.xarbcq.com) is Xi'an, leading the construction, over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, the maximum meet customer needs. Rainbow in Xi'an demolition leadership with the staff warmly welcome all inquiries negotiations to create Xi'an Rainbow Demolition better future. |
Admin>>>
You are the 34052 visitor
Copyright © GuangDong ICP No. 10089450, Xi'an Rainbow demolition Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 34052 visitor
Copyright © GuangDong ICP No. 10089450, Xi'an Rainbow demolition Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility